Skip to main content

TroCanada

Electrical

How Much Does a Kitchen Renovation Cost in Markham? (2026 Cost Guide)

How Much Does a Kitchen Renovation Cost in Markham? (2026 Cost Guide)

If you’re considering a kitchen renovation in Markham, one of the first questions you’ll ask is: “How much is this going to cost?”

The answer depends on far more than just cabinets and countertops.

Over the past 20+ years, we’ve renovated kitchens throughout Markham and the wider GTA — from established neighbourhoods like Unionville and Markham Village to newer subdivisions like Cornell, Wismer, Berczy Village, and Cathedraltown. One thing we’ve learned is that two kitchens can look very similar in photos but have dramatically different costs depending on what’s happening behind the walls.

The age of your home, the quality of materials you choose, electrical upgrades, plumbing changes, and structural modifications all play a major role in determining the final investment.

In this guide, we’ll break down realistic kitchen renovation costs in Markham for 2026, explain where your money goes, and help you understand what separates a $25,000 kitchen from a $100,000+ kitchen.

Want a realistic number for your specific kitchen? Book a free in-home Discovery Visit — we’ll walk through your space and give you a transparent quote you can compare against other contractors.

Typical Kitchen Renovation Costs in Markham (2026)

Most kitchen renovations in Markham fall into one of three categories.

Kitchen Refresh

Typical investment: $20,000 to $35,000

A kitchen refresh is ideal when your existing layout already works and you simply want a modern update.

Typical features include:

  • New cabinets
  • Quartz countertops
  • Quartz backsplash
  • New sink and faucet
  • New appliances
  • Fresh paint

The key to keeping costs in this range is avoiding major changes. In most refresh projects:

  • The sink stays where it is
  • The dishwasher stays where it is
  • The stove stays where it is
  • The refrigerator stays where it is
  • Existing flooring remains
  • Existing plumbing remains
  • Existing electrical already meets code

Because we’re not relocating services or opening up walls, costs remain controlled. This is a common choice in newer Markham homes — Cornell, Wismer, and Cathedraltown — where the original layout is functional and homeowners simply want updated finishes.

Typical timeline: 4 to 6 weeks

Best for: condos, rental properties, preparing a home for resale, or homeowners looking for a cosmetic update without major construction.

 

Mid-Range Kitchen Renovation

Typical investment: $40,000 to $70,000

This is the most common kitchen renovation we complete throughout Markham. It’s the sweet spot for most homeowners — a kitchen that feels custom without entering full luxury territory.

Typical features include:

  • Semi-custom or custom cabinetry
  • Quartz countertops
  • Tile or quartz backsplash
  • New flooring
  • Soft-close drawers and cabinet doors
  • Panel-ready dishwasher
  • Custom range hood
  • Improved lighting design
  • Under-cabinet lighting
  • LED pot lights

This is often where homeowners begin adding features they’ve always wanted — and it’s the level most commonly chosen in Unionville and Markham Village homes where homeowners are bringing a 1980s or 1990s kitchen fully into the modern era.

Electrical Upgrades Become Important

One surprise for many homeowners is that older kitchens often don’t meet today’s electrical requirements. Modern code typically requires dedicated circuits for:

  • Refrigerator
  • Stove
  • Microwave
  • Dishwasher

In older Markham homes, these appliances were often combined on shared circuits. As a result, electrical upgrades frequently become part of a mid-range kitchen renovation — and they’re one of the biggest sources of “surprise” costs when not budgeted upfront.

Typical timeline: 8 to 12 weeks

 

Luxury Kitchen Renovation

Typical investment: $75,000 and up

Luxury kitchens are much more than cabinet replacements. These projects often involve completely reimagining the space — and we see them most often in Angus Glen, Berczy Village, and Cathedraltown homes where owners are creating their forever kitchen.

Typical features include:

  • Full demolition
  • Structural modifications
  • Wall removal
  • Beam installation
  • Complete electrical upgrades
  • Complete plumbing upgrades
  • Custom cabinetry
  • Custom storage solutions
  • Large islands
  • Premium appliances
  • Full-height quartz backsplashes
  • Luxury lighting packages

Many luxury kitchens involve transforming older floor plans into modern open-concept living spaces.

Removing Walls and Opening Spaces

One of the most common requests we receive from Markham homeowners is: “We want to open the kitchen to the family room.”

While the result can be beautiful, this often requires:

  • Structural engineering
  • Building permits from the City of Markham
  • City inspections
  • Beam installation

Engineering and permit costs alone can range from approximately $3,500 to $5,500+ depending on complexity, before any actual construction begins.

Custom Cabinet Features

Luxury kitchens often include:

  • Pot drawers
  • Spice pull-outs
  • Custom organizers
  • Premium corner solutions
  • Fully custom cabinet sizing
  • Custom paint or stain finishes

These features dramatically improve both functionality and storage efficiency — and they’re one of the most common reasons our Markham clients tell us they love their finished kitchen years later.

Island vs Peninsula

Many older Markham homes have kitchen peninsulas. Luxury renovations often remove the peninsula and replace it with a large island that may include:

 

  • Seating
  • Additional storage
  • Sink relocation
  • New plumbing
  • New electrical

These changes create a more modern, social kitchen layout — but they involve significant plumbing and electrical work that drives the cost.

Typical timeline: 10 to 14 weeks or longer, depending on structural work and permit approvals.

Where Does Your Kitchen Renovation Budget Go?

One of the biggest misconceptions homeowners have is that all kitchens cost roughly the same. In reality, costs vary dramatically based on material selections.

Kitchen Cabinets

Cabinetry is typically the largest single line item in a kitchen renovation.

  • Basic cabinetry: approximately $350 to $400 per linear foot
  • Higher-end custom cabinetry: $1,500+ per linear foot

The difference comes from construction quality, storage solutions, finishes, hardware, custom sizing, and built-in organizational features.

Countertops

Quartz and granite countertops vary significantly in price.

  • Entry-level products: $75 to $80 per square foot
  • Premium selections: $180 to $200+ per square foot

Cost increases are often driven by thickness, edge profiles, material selection, full-height backsplashes, and feature walls. 

Appliances

Appliances have one of the largest pricing spreads in the entire renovation. A refrigerator alone can range from $2,500 to $25,000+.

Panel-ready appliances are particularly popular in luxury kitchens because they blend seamlessly with surrounding cabinetry — and they’re one of the signature features of high-end Markham renovations.

Hidden Costs That Surprise Homeowners

The biggest surprises usually happen behind the walls.

Electrical upgrades. Modern kitchens require significantly more power than kitchens built decades ago. If wiring must be upgraded, costs can increase quickly — especially when the electrical panel is located far from the kitchen. Running new wiring may require opening ceilings, walls, and finished basement areas.

Plumbing upgrades. Older plumbing systems may need modifications to support modern layouts and fixtures, particularly when you’re relocating a sink or adding an island with a prep sink.

Structural work. Removing walls often requires engineering, permits, inspections, and beam installation. These costs are frequently overlooked during initial budgeting and can add $8,000 to $15,000+ to a project.

For Markham homes built before 1990, we typically recommend setting aside a 10-15% contingency for these unknowns.

Why Kitchen Renovation Quotes Can Vary So Much

One contractor may quote $35,000. Another may quote $70,000. Why?

Because the scope isn’t always the same.

A lower quote may quietly exclude:

  • Electrical upgrades
  • Permits
  • Better cabinetry
  • Better hardware
  • Better lighting
  • Full project management
  • Waterproofing where needed
  • Disposal and cleanup costs

In many cases, homeowners don’t discover these differences until construction begins — and then it’s too late to switch contractors without significant cost and delay.

This is why we strongly recommend comparing detailed scopes of work, not just bottom-line numbers. A transparent, line-by-line quote tells you exactly what you’re paying for and protects you from “surprise” change orders later. Learn more about how we structure our quotes in our renovation process.

The Most Important Advice We Give Markham Homeowners

The best kitchen renovations always begin with planning.

Before demolition starts, make sure you have selected:

  • Cabinets
  • Countertops
  • Appliances
  • Hardware
  • Fixtures
  • Lighting

One of the biggest causes of renovation delays is waiting on products that haven’t been ordered. Starting construction before selections are finalized often creates unnecessary downtime and frustration — and on a kitchen project, every day of downtime means another day without a functional kitchen.

The more planning completed upfront, the smoother the renovation process becomes.

What Should You Budget for a Kitchen Renovation in Markham?

As a general guideline for 2026:

  • Kitchen Refresh: $20,000 to $35,000
  • Mid-Range Kitchen: $40,000 to $70,000
  • Luxury Kitchen: $75,000+
  • Major Custom Projects: $150,000 to $200,000+

The right budget depends on your goals, your home, and how long you plan to stay there.

If you’re preparing a Markham home for sale, a refresh may be the smartest investment. If this is your forever home, investing in a well-designed custom kitchen may provide decades of enjoyment.

If a bathroom renovation is also on your list, check out our companion guide: How Much Does a Bathroom Renovation Cost in Markham?

Why Markham Homeowners Choose T-ROC

The Renovators of Canada (T-ROC) has been headquartered in Markham at 15 Allstate Parkway for over 20 years. We’re not a Toronto company dipping into Markham — we live, work, and renovate in these neighbourhoods every day.

Every T-ROC kitchen renovation is backed by:

  • Our 15-year transferable workmanship warranty — the longest in the industry, transferable if you sell your home
  • A simple $500 deposit to start — no large upfront draws
  • Transparent milestone billing so you pay as progress is completed
  • Weekly progress photos and updates throughout your project
  • Detailed written scopes so there are no surprise change orders
  • Recognition as the 2025 & 2026 Consumer Choice Award winner for renovations
  • BBB accreditation and full insurance and bonding

Whether you’re refreshing a builder-grade kitchen in Cornell, transforming an outdated layout in Unionville, or designing a full luxury kitchen in Berczy Village, we treat every project with the same level of care and attention to detail.

Ready to Talk About Your Kitchen Renovation?

A kitchen renovation is often the most valuable renovation you can make to your home. It’s where families gather, meals are shared, and memories are created. Understanding where your money goes and planning properly from the beginning will help ensure your renovation delivers both value and long-term satisfaction.

If you’re considering a kitchen renovation in Markham and would like a realistic, in-home assessment of your project, we’d be happy to help.

Book your free Discovery Visit — we’ll walk through your space, discuss your goals, and provide a transparent, detailed quote you can actually compare against other contractors.

FAQ — Kitchen Renovation in Markham

How much does a small kitchen renovation cost in Markham?

A small kitchen renovation in Markham — typically a refresh where the layout stays the same, cabinets are replaced or refaced, and finishes are updated — generally starts around $20,000 and can reach $35,000 depending on cabinet quality, countertop selection, and appliance choices. Keeping plumbing and electrical in their existing locations is the biggest factor in keeping the cost in this range.

A kitchen refresh updates surfaces and fixtures — new cabinets, countertops, paint, appliances — while keeping the existing layout, plumbing, and electrical in place. A full renovation involves layout changes, possible wall removal, structural modifications, plumbing relocation, and electrical upgrades. A refresh in Markham typically runs $20,000-$35,000 while a full renovation runs $40,000-$70,000+ depending on scope.

Permits are required in Markham when plumbing is being relocated, structural changes are made (such as removing a load-bearing wall), or significant electrical work is involved. Cosmetic refreshes that don’t touch plumbing or structure typically don’t require a permit. As a Markham-based renovation contractor, we pull permits on your behalf and handle inspections when needed.

A kitchen refresh takes 4-6 weeks. A mid-range renovation takes 8-12 weeks. A luxury renovation with structural changes can take 10-14 weeks or longer. Custom cabinet lead times, inspections, and hidden conditions discovered during demolition can extend these timelines — which is why proper upfront planning is critical.

Common hidden costs include electrical upgrades (modern kitchens require more dedicated circuits than older homes were wired for), plumbing modifications when relocating sinks or adding islands, structural engineering and permit fees when removing walls ($3,500-$5,500+), and unexpected conditions like water damage or outdated wiring discovered during demolition. We typically recommend a 10-15% contingency for homes built before 1990.

The biggest reason quotes vary is that the scope of work is usually different even when it looks similar. Lower quotes often exclude electrical upgrades, permits, premium hardware, proper lighting plans, full project management, or disposal costs. Always compare detailed line-by-line scopes of work, not just bottom-line prices — this is how you avoid surprise change orders later.

Opening a kitchen to the family or dining room is one of the highest-impact renovations you can make in older Markham homes. It transforms the daily living experience and significantly improves resale value. But it requires structural engineering, building permits, beam installation, and city inspections — adding $8,000-$15,000+ to the base renovation cost before any finishes. For most clients in this for the long haul, the upgrade is worth it. For short-term flips, a refresh is usually the smarter call.

T-ROC’s 15-year transferable workmanship warranty is the longest in the Markham renovation industry. It covers all craftsmanship on the project and transfers to the new owner if you sell your home — making it a strong selling point at resale. This is part of every T-ROC kitchen renovation at no additional cost.

How Much Does a Bathroom Renovation Cost in Markham? (2026 Cost Guide)

How Much Does a Bathroom Renovation Cost in Markham? (2026 Cost Guide)

If you’re planning a bathroom renovation in Markham, one of the first questions you’ll ask is: “How much is this actually going to cost?”

The honest answer is that bathroom renovation costs vary significantly based on the size of the space, the quality of finishes, the age of the home, and whether you’re keeping the existing layout or redesigning it entirely.

After more than 20 years renovating bathrooms across Markham and the wider GTA — from established neighbourhoods like Unionville and Markham Village to newer subdivisions like Cornell, Wismer, and Berczy Village — we’ve learned that homeowners are often surprised by what truly drives the cost. Two bathrooms that look nearly identical on paper can have dramatically different price tags depending on what’s happening behind the walls.

This guide breaks down realistic bathroom renovation costs in Markham for 2026, explains what affects pricing, and shares the things we’ve learned from completing hundreds of bathroom projects in this community.

Typical Bathroom Renovation Costs in Markham (2026)

While every project is unique, most bathroom renovations in Markham fall into one of three categories.

Basic Bathroom Renovation

Typical investment: $14,000 to $18,000+

This level generally includes:

  • Keeping the existing layout
  • Replacing fixtures and finishes
  • New vanity
  • New toilet
  • New flooring and tile
  • Fresh paint
  • Updated lighting

This is often the most cost-effective approach because major plumbing relocation and structural changes are avoided. It’s a strong choice for newer Markham homes — Cornell, Wismer, Cathedraltown — where the existing layout works well and the homeowner wants a refreshed look without rebuilding from scratch.

Mid-Range Bathroom Renovation

Typical investment: $18,000 to $25,000+

This is the most common bathroom renovation category we see throughout Markham. Projects in this range typically include:

  • Larger custom shower
  • Higher-end tile selections
  • Custom glass enclosure
  • Improved lighting plan
  • Better storage solutions
  • Upgraded plumbing fixtures
  • Enhanced waterproofing systems

Many homeowners choose this level because it balances long-term value, functionality, and aesthetics. It’s especially common in established Unionville and Markham Village homes where homeowners want to bring a 1980s or 1990s bathroom fully into the modern era.

Luxury Bathroom Renovation

Typical investment: $25,000 to $65,000+

A luxury bathroom renovation in Markham typically includes:

  • Complete layout redesign
  • Freestanding tub
  • Heated floors
  • Custom vanities
  • Large-format tile
  • Premium fixtures
  • Extensive glass work
  • Specialty lighting
  • High-end finishes throughout

Some master ensuite and spa-style projects exceed this range, particularly in Angus Glen, Berczy Village, and Cathedraltown homes where the owners want a true retreat experience.

What Actually Drives Bathroom Renovation Costs?

Many homeowners assume the fixtures themselves are the biggest expense. In reality, bathroom renovations are one of the most labour-intensive renovations you can do in a home — and that labour is where most of the cost lives.

The largest cost drivers are:

1. Plumbing Relocation

One of the biggest factors affecting cost is whether plumbing stays where it is. Keeping your shower, toilet, and vanity in their existing locations helps control costs significantly.

Moving plumbing typically requires:

  • Opening floors
  • Reworking drains
  • Adjusting venting
  • Coordinating multiple trades

A bathroom that looks similar on paper can become significantly more expensive the moment plumbing locations change. We always walk Markham homeowners through these implications before any layout decisions are finalized.

2. Tile Selection

Tile affects both material cost and labour cost. Specifically:

  • Larger tiles often cost more per square foot
  • Specialty patterns require more labour to install
  • Feature walls increase installation time
  • Complex layouts create additional cutting and waste

Many homeowners focus only on the tile price tag and overlook the installation complexity that comes with premium selections. The right tile choice balances aesthetic goals with the labour cost it creates.

3. Glass and Shower Systems

Custom glass enclosures are one of the most requested upgrades in modern bathroom renovations. They create a beautiful, open, finished product — but they can add several thousand dollars compared to standard shower configurations. This is one of the cleanest “luxury feel for moderate cost” upgrades you can make.

4. Heated Floors

Heated flooring continues to grow in popularity across Markham. Many of our clients call it the single best upgrade they make, especially during Ontario winters when stepping onto a warm floor in the morning becomes a small daily luxury.

5. Age of the Home

Older Markham homes — particularly in Unionville and Markham Village — often present surprises once demolition begins. This can include:

  • Water damage behind tile and drywall
  • Previous renovation mistakes
  • Plumbing deficiencies
  • Structural issues
  • Outdated electrical systems

These conditions aren’t always visible during planning, and they’re one of the reasons we always recommend building a contingency into the budget for older homes.

Why Bathroom Renovation Quotes Can Vary So Much

One of the most common questions we hear is: “Why did one contractor quote $25,000 and another quote $45,000 for what seems like the same bathroom?”

The honest answer is that the scope is usually not actually the same. A lower quote may quietly exclude:

  • Waterproofing upgrades
  • Certain demolition work
  • Electrical improvements
  • Plumbing modifications
  • Permit requirements
  • Finishing details
  • Disposal costs

In many cases, homeowners don’t discover these differences until construction begins — and then it’s too late to switch contractors without significant cost and delay.

This is why we strongly recommend comparing detailed scopes of work, not just bottom-line numbers. A transparent, line-by-line quote tells you exactly what you’re paying for and protects you from “surprise” change orders later. Learn more about how we structure our quotes in our renovation process.

Hidden Costs Homeowners Don't Expect

Bathroom renovations are unique because much of the most important work happens behind finished surfaces. Until walls, floors, and ceilings are opened, certain conditions remain unknown.

Some of the most common discoveries:

Water damage. Years of moisture exposure can quietly destroy framing and subfloor behind tile and drywall.

Improper previous renovations. We’ve opened up bathrooms where previous contractors skipped important steps — missing waterproofing layers, undersized plumbing, incorrectly installed exhaust fans.

Plumbing issues. Older plumbing systems occasionally require updates to support modern fixtures and meet current code.

Electrical upgrades. Many older Markham bathrooms were not designed to handle today’s lighting, ventilation, and electrical requirements — adequate GFCI circuits, proper bath fan venting, etc.

These issues don’t occur on every project, but they should be factored into the budget when renovating older homes. We typically recommend a 10-15% contingency for homes built before 1990.

Common Bathroom Renovation Mistakes Markham Homeowners Make

After two decades of renovation work in this community, a few mistakes appear over and over.

Choosing based on price alone. The lowest quote is rarely the best value. It’s important to understand exactly what is included and excluded before signing.

Underestimating the budget. Many homeowners start with unrealistic expectations based on outdated pricing they found online. Construction costs, materials, and labour have changed significantly over the last several years.

Ignoring functionality. Beautiful bathrooms should work well for everyday life. Storage, lighting, layout, and accessibility often matter far more long-term than trendy finishes.

Focusing only on visible finishes. Tile and fixtures get the attention — but waterproofing, ventilation, and proper installation matter equally and often determine whether your renovation lasts 5 years or 20.

How Long Does a Bathroom Renovation Take in Markham?

Bathroom renovations require careful coordination between multiple trades. Timelines vary based on scope, but a realistic range is:

  • Basic renovation: 2-3 weeks
  • Mid-range renovation: 3-6 weeks
  • Luxury renovation with layout changes: 6-12 weeks

The timeline depends on:

  • Scope of work
  • Material availability
  • Custom product lead times (vanities, glass, premium tile)
  • Plumbing or structural modifications
  • Inspection scheduling
  • Hidden conditions discovered during demolition

A professionally managed renovation prioritizes quality and proper sequencing over rushing the process. We provide every Markham client with a detailed schedule before work begins so you know exactly what to expect each week.

Are Permits Required for a Bathroom Renovation in Markham?

Not every bathroom renovation requires permits. However, permits may be necessary when:

  • Plumbing is being relocated
  • Structural changes are involved
  • Significant building modifications are made
  • Specific code-related work is required

The City of Markham’s building department reviews permit applications and requires inspections at key construction stages. Electrical work must also comply with Electrical Safety Authority (ESA) standards and inspections.

Working with an experienced Markham renovation company ensures the work is completed safely, permitted properly, and inspected to current standards — protecting both your home and your investment.

What Should You Budget for a Good Bathroom Renovation in Markham?

If you’re looking for a realistic number to anchor your planning, most Markham homeowners today should expect to invest:

  • $14,000 to $18,000+ for a basic bathroom renovation
  • $18,000 to $25,000+ for a quality mid-range renovation
  • $25,000 to $65,000+ for a luxury bathroom renovation

The final number depends heavily on the selections you make and whether layout changes are involved. We always recommend an in-home consultation before committing to a budget — bathroom conditions vary enough that a real walkthrough produces a far more accurate estimate than any online calculator.

Why Markham Homeowners Choose T-ROC

The Renovators of Canada (T-ROC) has been headquartered in Markham at 15 Allstate Parkway for over 20 years. We’re not a Toronto company dipping into Markham — we live, work, and renovate in these neighbourhoods every day.

Every T-ROC bathroom renovation is backed by:

  • Our 15-year transferable workmanship warranty — the longest in the industry, transferable if you sell your home
  • A simple $500 deposit to start — no large upfront draws
  • Transparent milestone billing so you pay as progress is completed
  • Weekly progress photos and updates throughout your project
  • Detailed written scopes so there are no surprise change orders
  • Recognition as the 2025 & 2026 Consumer Choice Award winner for renovations
  • BBB accreditation and full insurance and bonding

Whether you’re updating a powder room in Cornell, modernizing a primary ensuite in Unionville, or designing a full spa retreat in Berczy Village, we treat every project with the same level of care and attention to detail.

Ready to Talk About Your Bathroom Renovation?

If you’re considering a bathroom renovation in Markham and would like a realistic, in-home assessment of your project, we’d be happy to help.

Book your free Discovery Visit — we’ll walk through your space, discuss your goals, and provide a transparent, detailed quote you can actually compare against other contractors.

FAQ — Bathroom Renovation in Markham

How much does a small bathroom renovation cost in Markham?

A small or basic bathroom renovation in Markham — typically a powder room or guest bath where the layout stays the same — generally starts around $14,000 and can reach $18,000 or more depending on tile, vanity, and finish selections. Keeping plumbing in its existing location is the biggest factor in keeping the cost in this range.

A $25,000 bathroom renovation in Markham typically includes new tile (floor and shower walls), a new vanity and faucet, new toilet, new lighting, a glass shower door, and updated plumbing fixtures — all with the layout staying the same. It does not usually include layout changes, custom millwork, heated floors, or premium tile.

Permits are required in Markham when plumbing is being relocated, structural changes are made, or significant electrical work is involved. Cosmetic refreshes that don’t touch plumbing or structure typically don’t require a permit. As a Markham-based renovation contractor, we pull permits on your behalf when needed.

A basic bathroom renovation takes 2-3 weeks. A mid-range renovation takes 3-6 weeks. A luxury renovation with layout changes can take 6-12 weeks. Custom products, inspections, and hidden conditions discovered during demolition can extend these timelines.

Common hidden costs include water damage repair, plumbing upgrades to meet code, electrical upgrades for modern lighting and ventilation, and fixes for improper previous renovations. We typically recommend setting aside a 10-15% contingency, especially for homes built before 1990.

The biggest reason quotes vary is that the scope of work is usually different even when it looks similar. Lower quotes often exclude waterproofing upgrades, certain demolition work, electrical improvements, permit requirements, or disposal costs. Always compare detailed scopes of work, not just bottom-line prices.

Bathroom renovations consistently rank among the highest-ROI home improvements in the Markham and GTA market. A quality bathroom renovation can recoup 60-70% of its cost in resale value while also significantly improving daily comfort and functionality. The longer you stay in the home, the better the return.

T-ROC’s 15-year transferable workmanship warranty is the longest in the Markham renovation industry. It covers all craftsmanship on the project and transfers to the new owner if you sell your home — making it a strong selling point at resale. This is part of every T-ROC bathroom renovation at no additional cost.

Is a Home Addition Worth It in Toronto? Cost vs. Value (2026 Guide)

Is a Home Addition Worth It in Toronto? Cost vs. Value (2026 Guide)

If your home is too small but you love your neighbourhood, you’ve probably asked yourself: should I add on, or should I move? In Toronto’s 2026 market — where the average detached home price is well over $1.3 million and transaction costs alone can run $80,000 to $150,000 — the math often favours building. But it’s not automatic. Here’s a clear-eyed look at when a home addition is worth it, when it isn’t, and how to make the decision with confidence.

The short answer: most home additions in the Greater Toronto Area return 50% to 75% of their cost in added home value — and when you factor in the money you’d spend buying and selling, a well-planned addition almost always comes out ahead of moving. But ROI isn’t the only thing that matters. Livability, lifestyle, and long-term plans play an equally important role.

Home Addition ROI in Toronto: What the Numbers Say

Let’s start with the honest truth: most home additions do not return 100% of their cost at resale. That’s normal — it’s true across North America, and Toronto is no exception. What matters is how much value they add relative to the alternatives.

Here’s what different types of additions typically return in the GTA market:

Kitchen extension or open-concept expansion: 70% to 85% ROI. This is consistently the highest-returning addition type in Toronto. Expanding a cramped kitchen into a modern open-concept kitchen and family room transforms how the home lives — and it’s the first thing buyers notice. If your home currently has a closed-off, undersized kitchen, this addition delivers the most value per dollar spent.

Primary suite or bedroom addition: 60% to 75% ROI. Adding a main-floor primary suite with an ensuite bathroom — or building a second storey to gain bedrooms — adds significant value and functionality. In family-oriented GTA neighbourhoods like Markham, Vaughan, and Richmond Hill, an extra bedroom can move your home into a higher price bracket entirely.

Second-storey addition: 55% to 70% ROI. Adding a full second storey to a bungalow is the most transformative addition possible — you’re essentially doubling your living space. The ROI percentage is slightly lower because the construction cost is high, but the absolute value added is enormous. A 1,200-square-foot bungalow that becomes a 2,400-square-foot two-storey home jumps into a completely different market segment.

In-law suite or multi-generational addition: 65% to 80% ROI. In the GTA, where multi-generational living is common, a self-contained in-law suite (separate entrance, kitchen, bathroom) is highly desirable. It appeals to a wide range of buyers — families with elderly parents, homeowners who want rental income, or buyers looking for a home office suite. This addition type consistently outperforms the market average for ROI.

The Real Comparison: Adding vs. Moving

Comparing the ROI of an addition to “100% of your money back” misses the point. The real comparison is: what does it cost to add the space you need versus what does it cost to buy a bigger home?

Here’s how the numbers typically work in the 2026 Toronto market:

Cost to move to a larger home in the GTA:

Real estate commission on selling your current home (typically 4-5% of sale price), land transfer tax on the new purchase (Ontario and Toronto municipal LTT combined can exceed $30,000 on a home over $1.5 million), legal fees for both transactions ($3,000 to $5,000), moving costs ($3,000 to $8,000), and the price premium for the larger home — which in Toronto often means $200,000 to $500,000 more than your current home’s value. Add it all up and the total cost of “moving up” in the GTA easily reaches $150,000 to $250,000+ in transaction costs alone, before you’ve gained a single square foot.

Cost of a well-planned addition:

A mid-sized rear addition (400 to 600 square feet) in Toronto costs $150,000 to $300,000 depending on the scope. A full second-storey addition runs $250,000 to $500,000+. These are significant investments — but they add the exact space you need, in the home and neighbourhood you already love, without the transaction costs of buying and selling.

When you run the full comparison, a home addition often costs less than moving — and you get a custom result designed exactly for your family’s needs, rather than compromising on someone else’s floor plan. For detailed pricing on every scope, see our Home Addition Cost in Toronto (2026 Guide).

When a Home Addition Makes the Most Sense

A home addition is the stronger choice when several of these factors are true for your situation:

You love your neighbourhood. Your kids’ schools, your commute, your neighbours, your proximity to parks and amenities — these things have real value that’s hard to replicate. If you’ve spent years building a life in your current neighbourhood, that’s worth protecting.

You need 300 to 800 more square feet, not a completely different house. If the gap between what you have and what you need is moderate — an extra bedroom, a larger kitchen, a family room — an addition fills that gap perfectly. If you need to go from a 1,500-square-foot semi to a 4,000-square-foot detached, moving probably makes more sense.

Your lot can support an addition. If your property has enough space for a rear or side addition within the zoning envelope — or if a second storey is structurally and financially feasible — you have a green light. T-ROC assesses this in the first consultation.

You plan to stay for 5+ years. The longer you live in the improved home, the more value you extract from the addition — both in daily livability and in accumulated home equity. If you’re planning to sell within 2 years, the ROI math gets tighter.

The Toronto real estate market favours renovation over buying. In 2026, with elevated mortgage rates, high transaction costs, and limited inventory of larger homes in desirable GTA neighbourhoods, the financial case for renovating over moving is particularly strong.

When Moving Might Be the Better Choice

An addition isn’t always the answer. Here are scenarios where moving may make more sense:

You need a fundamentally different type of home. If you’re in a townhouse and want a detached with a large lot, or you’re in a condo and want a house — no addition can bridge that gap.

Your foundation or structure can’t support it. Some older Toronto homes have foundation or structural issues that make an addition prohibitively expensive. If the cost of reinforcing the existing structure rivals the cost of the addition itself, the numbers stop making sense.

The addition would over-improve your home for the neighbourhood. If adding a second storey and 1,200 square feet would make your home worth $2.5 million in a neighbourhood where the ceiling is $1.8 million, you’ll never recover that investment at resale. A good contractor (and a good real estate agent) can help you evaluate this risk.

You’re planning to sell within 1 to 2 years. The disruption of an 8-to-14-month construction project — plus the uncertainty of completing on time and on budget — makes an addition risky if you’re not going to live in the result for at least several years.

How to Maximize the ROI of Your Home Addition

If you’ve decided to build, here’s how to ensure your addition delivers the best possible return — both in daily livability and resale value:

Design for the neighbourhood. Your addition should make your home competitive with the best homes on your street — not wildly exceed them. Match the architectural style, keep the proportions right, and ensure the addition looks like it was always part of the house.

Prioritize the kitchen and main living area. Open-concept kitchen and family room expansions consistently deliver the highest ROI. If you have budget for only one major improvement, this is where it should go.

Add a bathroom with every bedroom. In the GTA market, the ratio of bathrooms to bedrooms matters. If you’re adding a bedroom, add at least a three-piece ensuite. If you’re adding a second storey, a full primary suite with a four-piece ensuite is expected.

Don’t cut corners on the exterior. The addition needs to look like it belongs — matching siding, roofing, windows, and trim. A visible “seam” between the old and new sections drops the perceived value immediately.

Build with permits and to code. This isn’t just about avoiding fines — it’s about resale confidence. Buyers and their lawyers look for permits. A permitted, inspected addition is a selling point. An unpermitted one is a liability. If you’re not sure what permits your project needs, our guide to renovation permits in Toronto covers the basics.

Work with an experienced general contractor. The quality of the build directly impacts the ROI. Sloppy finishes, poor integration with the existing home, or code issues all erode value. At T-ROC, we’ve been building home additions across the GTA for years — and our clients consistently tell us their additions exceeded their expectations. See how we manage every project from design through final walkthrough.

The Bottom Line for Toronto Homeowners in 2026

In a market where moving costs $150,000+ in transaction fees alone, and the right bigger home in your neighbourhood might not even be available, a well-planned home addition is one of the smartest investments a Toronto homeowner can make. You get exactly the space you need, designed for your family, in the neighbourhood you’ve chosen — at a fraction of what it would cost to buy, sell, and move.

The key is doing it right: proper design, proper permits, proper construction, and a contractor who treats your home like their own. That’s what we do at T-ROC. Explore our home addition services or request a free estimate to find out what’s possible for your property.

Frequently Asked Questions

What is the ROI of a home addition in Toronto?

Most home additions in the Greater Toronto Area return 50% to 75% of their cost in added home value at resale. Kitchen expansions and in-law suites deliver the highest ROI (70-85%), while second-storey additions typically return 55-70%. The real value becomes clearer when you compare the addition cost to the $150,000+ it would cost to move to a bigger home in the GTA.

In most cases, adding on is cheaper than buying a bigger home when you factor in the full cost of moving — real estate commissions, land transfer taxes, legal fees, moving expenses, and the price premium for a larger home. In the 2026 Toronto market, transaction costs alone can exceed $150,000. A well-planned addition typically costs less and gives you exactly the space you need.

Kitchen and family room expansions consistently deliver the highest return on investment in the GTA market — 70% to 85% of the construction cost. In-law suites with separate entrances are a close second, especially in GTA neighbourhoods where multi-generational living is common. Adding a primary suite with ensuite bathroom is also a high-value addition.

We recommend planning to stay at least 5 years after completing an addition. This gives you time to enjoy the improved space and allows the home’s market value to appreciate. If you’re planning to sell within 1 to 2 years, the construction disruption and financial risk may outweigh the benefits.

Yes — adding livable square footage to your home will increase its assessed value, which means higher property taxes. The increase depends on the size and scope of the addition. The Municipal Property Assessment Corporation (MPAC) will reassess your property after the addition is completed. Your contractor can help you estimate the impact during the planning phase.

Do You Need a Permit for a Basement Renovation in Toronto? (2026 Guide)

Do You Need a Permit for a Basement Renovation in Toronto? (2026 Guide)

The short answer: if your basement renovation involves any plumbing, electrical, or structural work, yes — you need a building permit from the City of Toronto. If you’re only doing cosmetic work like painting and flooring, you probably don’t. But the line between “cosmetic” and “permit-required” is thinner than most homeowners think, and getting it wrong can cost you thousands in fines and forced rework.

Here’s a clear breakdown of when you do and don’t need a permit, what the process looks like, and why skipping it is never worth the risk — whether you’re finishing a raw basement or building a legal basement apartment in the GTA.

When You Need a Basement Renovation Permit in Toronto

The Ontario Building Code and the City of Toronto’s bylaws are specific about what requires a permit. Here are the scenarios where a building permit is mandatory:

New or relocated plumbing. Adding a bathroom, kitchen, or laundry in the basement means installing new drain lines, water supply lines, and vent stacks. Any new plumbing — or relocation of existing plumbing — requires a building permit. This includes cutting the concrete slab to install below-grade drains. A licensed plumber must do the work, and the City will inspect the rough-in before concrete is poured back.

New electrical circuits. If you’re adding new lighting, outlets, or dedicated circuits for appliances (a basement kitchen range, a dryer, a sub-panel), you need an electrical permit from the Electrical Safety Authority (ESA). This is separate from the building permit and has its own inspection process. Even adding a few pot lights to a basement that already has some wiring typically requires a permit if new circuits are being run from the panel.

Structural changes. Removing or modifying any load-bearing wall, installing a beam, underpinning the foundation to increase ceiling height, or adding a new exterior entrance — all of these require a building permit plus structural engineering drawings.

HVAC modifications. Extending ductwork from the existing furnace, adding a new heating source, or installing a new ventilation system (like an HRV) in the basement requires a permit if it involves new ductwork or modifying the existing system beyond simple register additions.

Building a secondary suite (legal basement apartment). This is the most permit-intensive basement project. A secondary suite requires a full building permit covering structural, plumbing, electrical, HVAC, and fire separation. The drawings must be prepared by a BCIN-registered designer, architect, or professional engineer, and the application must be submitted through Toronto’s ePlans portal.

Adding a new exterior entrance. Cutting a new doorway through the foundation wall for a separate basement entrance requires a building permit and structural engineering, since you’re modifying a structural element of the house.

When You Don't Need a Permit

Purely cosmetic basement work doesn’t require a building permit. This includes:

Painting and decorating. Painting walls, ceilings, and trim. Applying wallpaper or accent finishes.

Flooring installation. Installing luxury vinyl plank, carpet, tile, or engineered hardwood over an existing subfloor — as long as you’re not modifying the subfloor structure itself.

Replacing existing fixtures in the same location. Swapping a toilet, sink, or faucet in the exact same spot where one already exists (with no changes to the drain or supply lines) generally doesn’t require a permit. However, if you’re changing pipe sizes or rerouting any lines, a permit is needed.

Cabinet and shelving installation. Building storage, installing shelving, or adding a bar with a dry sink (no plumbing hookup) is cosmetic and doesn’t need a permit.

Minor drywall repairs. Patching, replacing, or refinishing existing drywall without altering the framing behind it.

The key distinction: if you’re working on what’s already there without changing the structure, plumbing, or electrical systems, you’re in cosmetic territory. The moment you open a wall, run new wiring, or touch a pipe, you’re in permit territory.

The Toronto Basement Renovation Permit Process

If your project does require a permit, here’s exactly how the process works in the City of Toronto as of 2026:

Step 1: Prepare Your Drawings

You’ll need detailed architectural drawings showing the existing basement layout and the proposed renovation — floor plan, electrical layout, plumbing layout, and any structural details. For a standard basement finish with a bathroom, a BCIN-registered designer can prepare these. For a legal secondary suite or any structural work, you’ll need an architect or engineer.

Step 2: Submit Through ePlans

As of 2026, the City of Toronto requires all building permit applications to be submitted digitally through the ePlans portal. Make sure to use the updated “Application for a Permit to Construct or Demolish” form (updated February 2026). Upload your drawings, fill out the application, and pay the permit fee.

Step 3: Wait for Review and Approval

Standard basement renovation permits take 2 to 4 weeks for approval. Legal basement apartment applications are more complex and can take 4 to 8 weeks. If the reviewer has questions or requires revisions, the clock resets — so submitting a complete, accurate application the first time saves significant time.

Step 4: Construction and Inspections

Once the permit is issued, construction can begin. At key milestones, you’ll need to call for inspections from the City:

Rough-in plumbing inspection — after drain lines and water supply are installed but before concrete is poured back and before drywall goes up.

Rough-in electrical inspection — after all wiring, boxes, and panel connections are made but before drywall.

Framing inspection — after all walls are framed but before insulation and drywall.

Insulation and vapour barrier inspection — after insulation is installed but before drywall.

Fire separation inspection (secondary suites only) — confirming the 1-hour fire-rated ceiling assembly meets code.

Final inspection — after all work is complete, confirming everything meets the approved drawings and the Ontario Building Code.

Each inspection must pass before the next phase of work can proceed. Your contractor should coordinate inspection scheduling to minimize downtime. At T-ROC, we build the inspection schedule into the project timeline from day one. Learn more about our renovation process and how we manage every detail.

Permit Costs for Basement Renovations in Toronto

Building permit fees in Toronto are calculated based on the scope and value of the work. Here’s what to expect:

Basic basement finish with bathroom: $1,500 to $3,500 for the building permit, plus $300 to $500 for the ESA electrical permit.

Legal basement apartment: $3,000 to $6,000+ for the building permit (the fee increases with the complexity and value of the work), plus electrical permit fees. Some municipalities charge additional development charges, though suites under 100 square metres are exempt under Ontario Regulation 332/12.

Architectural/design fees: A BCIN designer typically charges $1,500 to $4,000 for basement permit drawings. An architect charges more — $3,000 to $8,000+ — but is required for more complex projects.

These costs are part of the overall renovation budget and shouldn’t be treated as optional add-ons. They’re built into every T-ROC project estimate. For the full cost picture, check out our Basement Renovation Cost in Toronto (2026 Guide).

What Happens If You Renovate Without a Permit

Skipping the permit process is a gamble that homeowners lose — every time. Here’s what you’re risking:

Fines. The City of Toronto can impose fines exceeding $25,000 for homeowners and $50,000 for corporations for unpermitted construction work. These fines are per offence, meaning multiple violations can stack up quickly.

Stop-work orders. If a building inspector discovers unpermitted work in progress, they can issue an immediate stop-work order. Your project halts until permits are obtained — which means going back through the full application process while paying for a contractor who can’t work.

Forced demolition and rework. The City can require you to open up finished walls so they can inspect the work behind them. If the work doesn’t meet code, you’ll need to demolish and redo it — at your expense. This can easily double the cost of the renovation.

Insurance liability. If something goes wrong in an unpermitted basement — a fire, a flood, an injury — your homeowner’s insurance may deny the claim. Insurance companies routinely investigate whether renovated spaces had proper permits, especially for fire and water damage claims.

Problems when selling. When you sell your home, the buyer’s lawyer will check for open or missing permits. Unpermitted work can kill a deal, force a price reduction, or require you to obtain retroactive permits (which means opening walls for inspection). A legal basement apartment without proper permits isn’t actually legal — and marketing it as one creates additional liability.

Permits for Basement Renovations Across the GTA

The permit process differs slightly by municipality across the Greater Toronto Area. In Markham and Vaughan, the process is similar to Toronto but often faster — permit approval for a standard basement renovation typically takes 2 to 3 weeks. Richmond Hill, Mississauga, and Brampton each have their own application processes, some digital and some still paper-based.

Regardless of the municipality, the fundamental rule is the same: any work involving structure, plumbing, electrical, or HVAC needs a permit. At T-ROC, we handle the permit application process for every project we take on — from preparing the drawings to submitting the application to scheduling every inspection. Our clients never have to navigate the permit process on their own.

Explore our basement renovation services or request a free estimate to start planning your basement renovation the right way.

Frequently Asked Questions

Can I finish my basement without a permit in Toronto?

Only if the work is purely cosmetic — painting, flooring, and decorating with no changes to plumbing, electrical, or structure. The moment you add a bathroom, run new electrical circuits, or modify any walls, a building permit is required. Most basement renovations that go beyond basic cosmetic work need a permit.

Building permit fees for a standard basement renovation with a bathroom run $1,500 to $3,500. A legal basement apartment permit costs $3,000 to $6,000+. You’ll also need to budget for design/drawing fees ($1,500 to $4,000 for a BCIN designer) and an ESA electrical permit ($300 to $500).

Standard basement renovation permits take 2 to 4 weeks for approval through Toronto’s ePlans portal. Legal basement apartment permits, which require more detailed drawings and review, take 4 to 8 weeks. Submitting a complete application with all required drawings is the best way to avoid delays.

Depending on the scope, you’ll need rough-in plumbing, rough-in electrical, framing, insulation, and final inspections. Legal basement apartments also require a fire separation inspection. Each inspection must pass before the next phase of construction can proceed. Your contractor should coordinate the inspection schedule to keep the project moving.

Technically yes, but it’s expensive and disruptive. The City will require you to open up finished walls and ceilings so they can inspect the plumbing, electrical, and framing behind them. If the work doesn’t meet code, you’ll need to redo it. It’s always cheaper and faster to get the permit before work starts than to deal with retroactive permitting after the fact.

Garden Suite & ADU Regulations in Ontario: What You Need to Know (2026 Guide)

Garden Suite & ADU Regulations in Ontario: What You Need to Know (2026 Guide)

additions-that-add-value-to-a-home

If you’re thinking about building a garden suite, laneway house, or accessory dwelling unit (ADU) on your property in Ontario, the good news is that provincial legislation has made it easier than ever. But “easier” doesn’t mean “simple” — there are still zoning bylaws, building permits, size restrictions, and code requirements you need to navigate before breaking ground. Here’s what Ontario homeowners need to know in 2026.

Under Ontario’s More Homes Built Faster Act (Bill 23), most residential properties connected to municipal water and sewage are now permitted to have up to three residential units — typically the main house, an interior secondary suite (like a basement apartment), and a detached accessory dwelling unit (garden suite or laneway house). This “as-of-right” zoning means you don’t need a costly and uncertain rezoning application to build one. You do, however, need a building permit, and your project must comply with local setback, size, and height requirements.

If you’re wondering what a garden suite costs to build, our Garden Suite & ADU Cost in Ontario (2026 Guide) has the full pricing breakdown by size and type.

What Bill 23 Changed for Ontario Homeowners

Before Bill 23 passed in late 2022, building a garden suite or ADU in most Ontario municipalities required a zoning bylaw amendment — a process that could take 6 to 12 months, cost thousands in planning fees, and had no guaranteed outcome. Bill 23 changed that by requiring municipalities to allow up to three units on most residential lots as-of-right.

Here’s what that means in practice for homeowners in Toronto and across the GTA:

No rezoning required. If your property is in a residential zone (R1, R2, R3, or equivalent) and connected to municipal services, you have the right to build a garden suite without applying for a zoning change. This eliminates the biggest cost, risk, and delay from the process.

No additional parking required. Municipalities can no longer require you to add new parking spaces for an ADU. This is a major change — parking requirements were previously one of the biggest barriers to building garden suites on smaller urban lots.

Development charge exemptions. Ontario Regulation 332/12 exempts garden suites under 100 square metres from development charges. Depending on the municipality, this saves homeowners $20,000 to $40,000 in fees — a significant reduction in overall project cost.

Municipal restrictions limited. While municipalities can still set rules around setbacks, height, and lot coverage, they cannot effectively ban garden suites through overly restrictive bylaws. The province has set the floor — cities can add reasonable conditions, but they can’t say no outright.

Zoning Rules by GTA Municipality

While Bill 23 set the provincial framework, each municipality has its own specific bylaws governing garden suite size, height, setbacks, and lot requirements. Here are the key rules for the most common GTA municipalities:

City of Toronto

Toronto’s Garden Suites Bylaw permits detached ADUs in most residential zones. The maximum footprint is generally the lesser of 10% of the lot area or 60 square metres (approximately 645 square feet), though larger lots may allow up to 90 square metres. Maximum height is 6 metres (about 20 feet), and the suite must be setback at least 1.5 metres from the rear lot line and 1.5 metres from side lot lines. The minimum lot frontage is typically 6 metres, and the lot must be connected to municipal water and sewer.

Markham

The City of Markham permits garden suites on residential lots with a minimum lot area of 450 square metres and minimum frontage of 15 metres. The maximum building size is 90 square metres (approximately 969 square feet) with a 6-metre height limit. Setback requirements typically mirror the main dwelling’s rear and side yard setbacks. Markham’s permitting process has been relatively streamlined for as-of-right projects.

Vaughan

Vaughan permits additional residential units including detached garden suites on qualifying lots. Size and setback requirements are similar to other York Region municipalities — maximum building area around 80 to 90 square metres with a 6-metre height restriction. Lot coverage limits apply and include both the main dwelling and the garden suite.

Richmond Hill

Richmond Hill’s bylaws allow garden suites on eligible residential properties. The maximum permitted size, setback requirements, and height limits are generally consistent with the York Region approach. Homeowners should confirm their specific lot’s eligibility through the City’s planning department or a qualified designer.

Building Permit Requirements

Even though rezoning isn’t needed, a building permit is mandatory for every garden suite project in Ontario. No exceptions. The building permit ensures your suite meets the Ontario Building Code for structural integrity, fire safety, energy efficiency, and habitability.

Here’s what the permit process involves:

Architectural drawings. Your permit application requires detailed drawings — site plan, floor plan, elevations, cross-sections, and foundation details — all drawn to scale. In most municipalities, these must be prepared by a BCIN-registered designer (Building Code Identification Number), a licensed architect, or a professional engineer.

Structural engineering. If the garden suite has a basement or second storey, or if the design includes any non-standard structural elements, a structural engineer’s stamp is required on the drawings.

Application submission. In Toronto, all applications go through the ePlans digital portal. Other GTA municipalities have their own submission processes — some digital, some still paper-based. Ensure your application package is complete before submitting; incomplete applications get sent back and restart the clock.

Permit fees. Building permit fees for garden suites range from approximately $10,500 to $20,000 depending on the municipality and the size of the project. Some municipalities charge additional fees for plan review, inspections, or lot grading review.

Approval timeline. Complete applications that meet all zoning requirements are typically approved in 8 to 16 weeks. Toronto’s process tends to fall on the longer end; smaller municipalities may be faster.

Ontario Building Code Requirements for Garden Suites

Your garden suite must meet the Ontario Building Code (OBC) — the same code that governs new homes. Here are the key requirements homeowners should understand:

Minimum ceiling height. Living areas must have a minimum finished ceiling height of 2.3 metres (approximately 7 feet 6 inches). Bathrooms and hallways can be slightly lower.

Bedroom egress windows. Every bedroom must have a window large enough for emergency escape — minimum 0.35 square metres of unobstructed opening. This is a life-safety requirement and is non-negotiable.

Fire separation. If the garden suite is within a certain distance of the main dwelling or the property line, fire-rated construction is required on the facing walls. Your designer will calculate the specific requirements based on your lot layout.

Insulation and energy efficiency. Garden suites must meet current OBC energy efficiency standards, which typically means R-24 walls, R-50 attic, and high-performance windows. As of 2026, full-height insulation on basement or crawlspace walls is also required.

Plumbing and electrical. The suite needs its own complete plumbing system (kitchen sink, bathroom fixtures, water heater) and a properly sized electrical panel with its own service or sub-panel from the main house. All plumbing and electrical work requires inspections.

Smoke and carbon monoxide alarms. Interconnected smoke alarms and CO detectors are required in all sleeping areas, hallways, and any room with a fuel-burning appliance.

Accessibility. While full accessibility isn’t required for all garden suites, designing with accessibility in mind — wider doorways, a step-free entrance, a main-floor bathroom — significantly increases the suite’s versatility for aging-in-place or multi-generational use.

Common Mistakes That Delay Garden Suite Projects

We’ve seen homeowners lose months — and thousands of dollars — on avoidable mistakes. Here are the most common ones:

Starting construction without a permit. This is the most expensive mistake. If the City discovers unpermitted work, you’ll face stop-work orders, fines (up to $25,000 for homeowners in Toronto), and potentially be required to demolish and rebuild to code. A permit protects you — never skip it.

Assuming your lot qualifies without checking. Not every lot meets the minimum size, frontage, or servicing requirements for a garden suite. A 10-minute call to your municipality’s planning department — or a consultation with your contractor — confirms eligibility before you invest in design.

Hiring a contractor before designs are permitted. Some homeowners sign a construction contract and set a start date before the permit is approved. If the permit takes longer than expected — or requires design revisions — you’re paying for a contractor who can’t start.

Ignoring servicing requirements. Connecting the garden suite to municipal water, sewer, and hydro requires site servicing work that many homeowners underestimate. Sewer connections in particular may require a licensed plumber to install a new lateral line, which involves excavation and City inspections.

Underestimating the timeline. From design to completed construction, a garden suite takes 8 to 14 months. Homeowners who expect to be done in 3 to 4 months end up frustrated. Set realistic expectations from the start. At T-ROC, we lay out the full timeline — every milestone — before any work begins. Learn about our process and how we keep every project on track.

Is a Garden Suite Right for Your Property?

A garden suite makes the most sense when your lot has enough space, your goals include rental income or multi-generational living, and you’re prepared for the 8-to-14-month process. For homeowners in Markham, Vaughan, Richmond Hill, and across the GTA, the regulatory landscape has never been more favourable — Bill 23 removed the biggest barriers, and municipalities are processing applications more efficiently each year.

If you’re weighing a garden suite against a basement apartment, they’re not mutually exclusive — under Bill 23, you can potentially have both (three units total on one lot). A basement suite is faster and less expensive to build; a garden suite offers more privacy and typically commands higher rent. Many GTA homeowners are building both to maximize their property’s income potential.

At T-ROC, we build garden suites and ADUs across the Greater Toronto Area — from compact 500-square-foot studios to full 900-square-foot two-bedroom suites. Explore our ADU and garden suite construction services to see what’s possible on your property, or request a free estimate to get started.

Frequently Asked Questions

Do I need a rezoning to build a garden suite in Ontario?

In most cases, no. Under Bill 23 (More Homes Built Faster Act), garden suites are permitted as-of-right on most residential properties connected to municipal water and sewage in Ontario. You still need a building permit, but the costly and uncertain rezoning process has been eliminated for qualifying properties.

In the City of Toronto, the maximum garden suite footprint is generally the lesser of 10% of the lot area or 60 square metres (about 645 square feet), though larger lots may allow up to 90 square metres. The maximum height is 6 metres. Other GTA municipalities have similar but slightly different limits — check your local bylaws for specifics.

Complete building permit applications for garden suites are typically approved in 8 to 16 weeks, depending on the municipality and the complexity of the project. Toronto tends to fall on the longer end. Submitting a thorough, complete application with all required drawings is the best way to avoid delays.

Yes — under Bill 23, most residential lots in Ontario can have up to three units: the main dwelling, one interior secondary suite (such as a basement apartment), and one detached accessory dwelling unit (garden suite). This allows homeowners to maximize rental income from a single property.

No. Under Bill 23, Ontario municipalities can no longer require additional parking spaces for accessory dwelling units including garden suites. This is a significant change that makes garden suites feasible on smaller urban lots where adding a parking space would have been impractical or impossible.

How Long Does a Home Addition Take in Toronto? (2026 Timeline Guide)

How Long Does a Home Addition Take in Toronto? (2026 Timeline Guide)

what-additions-add-value-to-a-home

A home addition is the biggest residential construction project most Toronto homeowners will ever take on — and the timeline reflects that. Unlike a kitchen or bathroom renovation where work wraps in a few weeks, an addition involves architects, engineers, permits, zoning, and months of construction. Here’s a realistic breakdown of how long the process takes from first conversation to move-in day.

The full home addition process — from initial design through to completed construction — typically takes 8 to 14 months in the Greater Toronto Area. That breaks down into 3 to 6 months for design, engineering, and permit approval, plus 3 to 8 months of active construction depending on the size and complexity of the addition. Smaller bump-outs and single-room additions fall on the shorter end; full second-storey additions and large rear extensions land on the longer end.

Those timelines assume no zoning variances are needed. If your project requires a Committee of Adjustment hearing, add another 2 to 4 months to the pre-construction phase. At T-ROC, we assess zoning compliance in the first meeting so there are no surprises down the road. If you’re still working out what an addition will cost, our Home Addition Cost in Toronto (2026 Guide) has the full pricing breakdown.

Home Addition Timeline by Project Type

Not all additions are the same scope. A sunroom bump-out and a full second-storey addition are fundamentally different projects — and the timelines reflect that.

Single-Room Addition or Bump-Out (3 to 5 Months Construction)

This includes extending the kitchen, adding a main-floor family room, or building a sunroom off the back of the house. The footprint is typically under 300 square feet, and the existing roof may or may not be affected depending on the design. Foundation work is required (either a full foundation or helical piles depending on the size), and the addition needs to be tied into the existing structure — roofing, siding, electrical, HVAC, and plumbing all need to be connected and matched. Permit approval for a straightforward bump-out in Toronto takes 4 to 8 weeks. If the addition is under 100 square metres and fully zoning-compliant, the City of Toronto’s FASTRACK program can approve permits in as little as 5 to 10 business days.

Rear or Side Addition (5 to 7 Months Construction)

A larger addition — expanding the kitchen and adding a family room, building a new primary suite on the main floor, or extending the back of the house by 15 to 20 feet — is a more substantial project. It typically involves a full poured concrete foundation, structural steel or engineered beams where the addition meets the existing house, new roofing tied into the existing roof, and full mechanical (HVAC, plumbing, electrical) integration. Architectural drawings and structural engineering are required, and permit approval takes 6 to 12 weeks depending on complexity. Construction runs 5 to 7 months including foundation, framing, enclosure, mechanical rough-ins, insulation, drywall, and finishing.

Second-Storey Addition (6 to 8 Months Construction)

Adding a full second storey to a bungalow is the most complex residential addition. The existing roof is removed, the main floor structure is reinforced (or rebuilt) to carry the load of the new storey, and an entirely new floor, walls, and roof are built on top. This project requires an architect, a structural engineer, and typically involves zoning analysis to confirm the new height complies with local bylaws. If a minor variance is needed — which is common for second-storey additions in older Toronto neighbourhoods — the Committee of Adjustment process adds 2 to 4 months. Construction typically takes 6 to 8 months from the day the roof comes off to the final walkthrough.

The Pre-Construction Phase: Design, Engineering, and Permits

What surprises most homeowners is how long the process takes before any construction starts. For a home addition in Toronto, the pre-construction phase is often as long as — or longer than — the construction itself.

Initial design (4 to 8 weeks). Working with an architect or designer to develop the floor plan, elevations, and overall concept. This includes measuring the existing house, discussing your needs, and producing preliminary drawings for your approval. Expect two to three rounds of revisions before the design is finalized.

Structural engineering (2 to 4 weeks). Once the architectural design is locked, a structural engineer reviews the plans and designs the foundation, beams, columns, and load paths. This is mandatory for any addition in Toronto, and the engineered drawings are required for the building permit application.

Permit application and approval (4 to 12 weeks). The City of Toronto requires all building permit applications to be submitted through the ePlans digital portal. A standard addition permit takes 6 to 12 weeks for review and approval. Simpler projects that qualify for the FASTRACK program can be approved much faster. If your project requires a minor variance — for setback, lot coverage, or building height — the Committee of Adjustment process adds 2 to 4 months and involves neighbour notification, a public hearing, and a decision period.

Contractor selection and scheduling (2 to 4 weeks). Getting quotes, reviewing contracts, and booking your contractor’s schedule. At T-ROC, we’re often involved from the design phase, so we can provide accurate budgeting early and schedule construction to start as soon as permits are issued. Learn about our renovation process and how we manage every phase.

What Affects Your Home Addition Timeline

Several factors can push your addition timeline shorter or longer. Here are the ones that matter most in Toronto:

Zoning compliance. If your addition fits within the existing zoning envelope — setbacks, lot coverage, height, floor space index — the permit process is straightforward. If it doesn’t, you’ll need a minor variance from the Committee of Adjustment. This is the single biggest potential delay in the process, adding 2 to 4 months. A zoning review should be the first step in any addition project.

Foundation type and soil conditions. Every addition needs a foundation, and the type depends on the scope. A small bump-out might use helical piles (installed in a day). A large addition requires a full poured concrete foundation — excavation, forming, pouring, waterproofing, and backfilling — which takes 2 to 3 weeks. If the soil conditions are poor (high water table, clay, or rocky ground), the foundation work takes longer and may require engineered solutions.

Season and weather. Toronto’s climate matters. Starting foundation work between April and September avoids the complications of frozen ground and cold-weather concrete curing. Framing and roofing are best done in dry conditions. If construction extends into winter, temporary heating and weather protection are needed, which adds cost and can slow down certain trades. The ideal time to start an addition in Toronto is spring, with the goal of having the structure enclosed (roof and windows in) before November.

Existing home condition. Tying a new addition into an older home often reveals issues — outdated wiring, undersized electrical panels, plumbing that doesn’t meet current code, or structural elements that need reinforcing. These aren’t unusual, but they can add 1 to 3 weeks depending on what’s found. Homes built before the 1970s in Toronto are the most likely to have hidden issues.

Material lead times. Windows, exterior doors, roofing materials, and custom millwork all have lead times. Large or specialty windows can take 6 to 12 weeks from order to delivery. Your contractor should be ordering long-lead items during the permit approval phase so they arrive on time for installation.

Mechanical integration. Extending HVAC ductwork, adding plumbing runs, and upgrading electrical service to the new addition all require coordination with the existing systems. If the existing furnace or air conditioner can’t handle the added load, replacement or supplementation is needed — which adds time and cost to the mechanical phase.

A Typical Home Addition Schedule: Phase by Phase

Here’s a realistic construction timeline for a mid-sized rear addition in Toronto (approximately 400-600 square feet). This assumes permits are approved and materials are ordered.

Phase 1: Site Prep and Foundation (Weeks 1–3)

Excavation for the new foundation, forming, rebar placement, concrete pouring, and waterproofing. The foundation needs to cure before framing begins. If the addition connects to the existing basement, openings are cut and waterproofed during this phase. A temporary weather barrier protects the existing home during the transition.

Phase 2: Framing and Structural (Weeks 4–6)

Floor joists, wall framing, roof framing, and structural steel (if applicable) go up. The addition starts to take shape. Sheathing goes on the exterior walls and roof, and windows and exterior doors are installed. At this point, the structure is “dried in” — meaning it’s protected from weather — and interior work can begin regardless of outdoor conditions.

Phase 3: Roofing, Siding, and Exterior (Weeks 6–8)

Roofing is installed and tied into the existing roof. Exterior siding or brick is applied to match the existing home. Exterior trim, soffits, fascia, and eavestroughs are completed. The goal is to make the addition look like it was always part of the house — not like something that was bolted on.

Phase 4: Mechanical Rough-Ins (Weeks 8–10)

HVAC ductwork is extended from the existing system (or a new system is installed). Plumbing supply and drain lines are run for any new fixtures. Electrical wiring, outlets, switches, and panel upgrades are completed. Each trade requires a separate rough-in inspection from the City of Toronto before insulation and drywall can go in.

Phase 5: Insulation, Drywall, and Interior Finishing (Weeks 10–16)

Spray foam or batt insulation is installed to Ontario Building Code standards. Drywall is hung, taped, mudded, and sanded. Then comes painting, flooring, trim, doors, cabinetry (if applicable), lighting fixtures, plumbing fixtures, and all the finishing details. The tie-in area — where the addition meets the existing home — gets special attention to ensure the transition is seamless.

Phase 6: Final Inspections and Cleanup (Weeks 16–18)

Final building inspection, final plumbing and electrical inspections, and any occupancy requirements are completed. Punch-list items are addressed — minor touch-ups, adjustments, hardware installation. The site is cleaned up, landscaping is restored, and the addition is officially complete.

Home Addition Timelines Across the GTA

Home addition timelines are broadly similar across the Greater Toronto Area, but permitting timelines vary by municipality. The City of Toronto’s permitting process is typically the longest — 6 to 12 weeks for a standard addition. Markham, Vaughan, and Richmond Hill tend to process residential addition permits in 4 to 8 weeks, which can shave a month or more off the pre-construction phase.

In Mississauga, Oakville, and Burlington, timelines are comparable to the 905-region average. Smaller municipalities sometimes have faster turnaround on permits but fewer available contractors, which can affect scheduling.

At T-ROC, we build home additions across the GTA — from second-storey additions on bungalows in Scarborough to large rear extensions in Markham and Vaughan. Every project follows the same disciplined process: detailed design, proactive permitting, and a phased construction schedule with no gaps. Explore our home addition services to see what’s possible for your property.

How to Keep Your Home Addition on Schedule

Start with a zoning review. Before you invest in architectural drawings, confirm your property’s zoning allows the addition you want — or understand exactly what variances you’ll need. This single step prevents the biggest potential delay in the entire process.

Hire your architect and contractor early. The best architects and general contractors in the GTA book months in advance, especially for spring starts. Begin the design process 6 to 8 months before your ideal construction start date.

Order long-lead materials during the permit phase. Windows, specialty doors, and custom finishes should be ordered as soon as designs are finalized — don’t wait for permits to come through. This way, materials arrive when construction is ready for them.

Make all design decisions before construction starts. Flooring, fixtures, cabinetry, paint colours, lighting — every selection should be finalized before the first shovel goes in the ground. Mid-project changes are the most common cause of delays and cost overruns on additions.

Choose a general contractor who manages the full build. A home addition involves 10 to 15 different trades over several months. Without a general contractor coordinating every trade, every inspection, and every delivery, gaps in the schedule are inevitable. At T-ROC, we manage every phase from foundation to final walkthrough. Request a free estimate and we’ll map out your complete addition timeline.

Frequently Asked Questions

How long does a home addition take from start to finish in Toronto?

The full process — design, engineering, permits, and construction — typically takes 8 to 14 months in the Greater Toronto Area. Construction alone runs 3 to 8 months depending on the size and type of addition. A single-room bump-out is on the shorter end; a full second-storey addition is on the longer end.

Standard building permit approval for a home addition in Toronto takes 6 to 12 weeks through the City’s ePlans portal. Smaller projects that qualify for the FASTRACK program can be approved in 5 to 10 business days. If a Committee of Adjustment variance is needed, add 2 to 4 months for the hearing and decision process.

Spring (April to June) is the ideal time to begin construction. This allows foundation work to happen in good weather and gives enough time to enclose the structure — roof and windows installed — before winter. Starting design and permits in the fall gives you the best chance of a spring construction start.

In most cases, yes. For rear and side additions, the existing home remains livable throughout construction, though you’ll deal with noise, dust, and some disruption. For a second-storey addition where the roof is removed, you may need to relocate for 2 to 4 weeks during the framing and enclosure phase, depending on how the contractor manages weather protection.

A home addition expands your existing house — adding bedrooms, living space, or a new floor. A garden suite (ADU) is a separate structure in your backyard. Additions typically cost more per square foot but add the most resale value because they increase your home’s total living area. Garden suites are ideal for rental income or multi-generational living. Learn more about our ADU and garden suite construction services to compare your options.

7 Home Improvement Projects to Never DIY

As a homeowner, you have no shortage of responsibility. Many maintenance tasks must be completed to keep your home functional and in excellent condition. To help you save some costs, you may consider completing many of these home improvement projects on your own. While there are some benefits to tackling these projects by yourself, sometimes being your own handyman isn’t the wisest decision. There are many home improvement projects that you should never complete on your own. To name a few… 

1. Plumbing

It should be a general rule in your home to never touch the pipes and DIY plumbing projects. The plumbing on your property is a complex system. One small mistake could cause extensive damage and hundreds (if not thousands) of dollars in repairs. If you are completing major home improvement projects in your home such as remodeling your current bathroom or adding a new bathroom, always hire a professional. If there are smaller tasks you need to accomplish like unclogging a toilet or replacing a faucet, these are tasks that you can likely DIY. 

However, if you have any concerns or questions regarding the task, no matter how large or small, call a plumber. You will save time and energy and you will reduce the risk of damage. 

2. Improving Your Kitchen Layout

It isn’t uncommon for homeowners to desire major changes to their kitchen. Their current kitchen may have a disorganized and poorly-designed layout or feel small and cramped. If you want to make some changes to the kitchen design, always hire a professional contractor in Toronto. 

When you remodel a kitchen, you can potentially run into many issues. You must also complete a myriad of tasks from electrical work, painting, woodworking, cabinetry, etc. If you are not a professional in all of these areas, doing a poor job can affect the look of the room or you may experience even more problems. Some projects may also require specific permits that you may not know about or you do not properly acquire. Hiring a contractor can reduce the stress and physical exertion from this project and you will likely be more satisfied with the final result. 

3. Installing New Flooring

New flooring throughout your home can make a major difference to the overall look and feel of your space. It can turn an outdated room into a comfortable, updated living area. Plus, by installing timeless flooring options, such as hardwood, you can make the home more appealing to potential buyers and increase your home’s value if you wish to sell the property in the future. 

There are several flooring options available ranging from carpet, stone, linoleum, hardwood, more. By giving this home improvement project to the pros, you have an expert on your side to help you choose the right type of flooring for the specific space. Plus, you may be one of the unlucky few who find many problems such as mold, mildew, or warped wood, lurking underneath your current flooring. A professional will know how to handle the situation, help you find the best treatment option, and ensure the situation is handled quickly and properly. 

4. Installing and Sealing Grout

Grout is a porous substance. It absorbs bacteria, grime, dirt, and other elements. When these items are absorbed, it gives the grout a dirty, grimy appearance. To prevent this from happening, the grout must be installed correctly and properly sealed. If not, the lifespan of the grout is decreased, it is more susceptible to damage, and the grout’s damage can affect your tiles. Plus, if the sealant is not installed properly, it can cause bubbles or gaps where moisture can seep into the grout, causing mold and mildew. 

There are many grout DIY kits available and tutorials online that you may wish to follow to seal the grout around your home. However, while these can provide you some guidance, even the smallest mistake can cause significant problems in the long term. You should always hire a professional to tackle any grout-related project, regardless of where it is in your home. Many of these experts can also help you recolour and sanitize these areas as well. 

5. Remodeling Your Basement

Remodeling the basement in your Markham home is a large project. Even if you are in no rush to complete the task, it should never be something you try to DIY. There may be many aspects to this project from plumbing and electrical work to sheetrock and flooring. If you also want to create a basement that is unique and has customised spaces, a professional is best to assist. Not only will this individual have many unique and appealing ideas for you to implement in your basement, they can also tackle any issues that you may experience and ensure that all projects are completed well. 

6. Installing New Windows 

There are many benefits to installing new windows throughout your home. New glass panes will not only improve the look in both the interior and on the exterior of the home, but they will increase your home’s energy efficiency as well. New windows can also improve the temperature control in your home, providing for a more comfortable and relaxing space. 

While installing windows in your home may seem like a very simple task, it is not. At the beginning of the process, you will want a professional to consult with. You will want to make sure you have the best products for your home. A professional can also spot any issues you may have with the project and help you throughout the process. 

Additionally, when you install windows, they must be installed correctly. The right supplies and installation techniques will make all the difference during this critical project. When windows are installed incorrectly, your home’s energy-efficiency may suffer, it can affect the cosmetic appearance of your home, and you increase the risk of small gaps that let air, bugs, dirt, and other elements in and out of the home. 

7. Electrical Work

Similar to plumbing, electrical work is a complex system. However, when it comes to this aspect of the home, one small mistake can not only damage your entire system but it can cause severe injury. Additionally, when the work is not completed well or there are errors made, you greatly increase your risk of a fire in your home. When completing any type of major electrical project, it is not only important for the safety of yourself but for your home as well. 

There are many electrical projects you may wish to complete such as creating additional electrical sockets in a room, installing more lighting, etc. If working on these projects with minimal know-how, you may mess with the system and cause extensive problems that will not only take more time to solve but can cost you more in the long run as well. 

Keep in mind that every electrical project will not require the help of an electrician. For example, some tasks such as replacing outdated light switches or electrical cover plates are simple to accomplish. Installing many new light fixtures are also very simple and by following the detailed instructions provided, can be accomplished quickly and easily. 

Luckily, finding a professional to complete the work for you and who will deliver high-quality no matter the project is easy when you work with The Renovators of Canada. These home renovation experts in Toronto will work closely with you to help you complete a project that you love. They have the ideas and the expertise to create a dream space and to ensure all of your projects are completed quickly and have the result that you desire. Call The Renovators of Canada today to schedule your consultation. 

Why Should Choose the Renovators of Canada for Home Renovations

Whether you are looking to remodel your kitchen, basement, or even the bathroom in your Toronto home, choosing the right contractor is one of the most important decisions you will make. Not only will this decision affect the final outcome of the project, but it will provide you with a smooth and enjoyable experience.

And while the quality of work that the contractor in Canada completes is of utmost importance, it isn’t the only thing that should be taken into consideration. There are many factors that must be evaluated.

Things to Consider When Looking for a Contractor

Not all contractors are the same and it is important that you don’t rush into hiring any company or professional without a full evaluation. Here are just a few things you should consider as you make your choice.

Basic Background Information: You want to ensure that the contractor you choose meets all necessary requirements to legally perform the work. For example, does the company have a current license? What does their insurance coverage look like? These aspects are all important to help you ensure the project is done well and if any problem occurs, that the proper documentation and coverage is available.

Recommendations: If you have a contractor in mind, ask if they can provide references from former clients. You want to speak with past clients to not only determine the company’s quality of work but to also learn how easy they were to work with. You want to work with experts who are friendly, knowledgeable, and honest. Ask about how well the company worked within a budget, followed a schedule, and more. It is also a smart idea to determine if the company has any legal actions against them.

Offers Ideas and Listens to Your Own: This is your home and your project. What you want to do and the ideas you have should be expressed and implemented by the contractor. Good contractors will help you incorporate your ideas and create the space that you envision. But, they also have their own ideas and tips for enhancing the space. Some of the best contractors, like The Renovators of Canada, have a gallery of past projects they have completed so you can easily gather ideas and piece together a stunning space.  

What Type of Customer Service Training Is Important?

In addition to the items listed above, customer service must be a priority and for The Renovators of Canada, it is. They understand that customer service is what creates loyal customers and it encourages the recommendations and referrals to help their business succeed. But even more important, they understand that this is your home — one of the biggest investments you will ever make. A home renovation can be a frustrating and inconvenient process and they want to make the process as smooth and enjoyable for you as possible. Here are a few areas where this home remodel company is striving to ensure you experience incredible customer service.

  1. They Are the Experts

When you are tackling a big project such as a basement remodel or a kitchen renovation, you will likely have dozens of questions and concerns. You want to work with a company that will not only provide you with a detailed explanation but will also ensure that you understand and feel good about their explanation. Additionally, you shouldn’t have to wait a long time for a response either. Rather than wait for days for these questions and concerns to be answered, they should be answered in a fast and timely manner.

  1. Very Friendly and Upbeat

A home remodel is a very exciting project but it can also be very challenging and frustrating. A good contractor, such as The Renovators of Canada, recognize that. No matter how you are feeling, they should be friendly and warm. You should feel comfortable coming to them with questions or concerns and you should walk away from any employee from the company in good spirits.

  1. Listen to What You Say

Whether you are concerned about a change in plans, the price, or just don’t love the current design ideas, an employee from the best companies should be there to listen to your concerns. They should not shrug you off but work with you to address your concerns. And if you are in need of more ideas or how to customize your current plan before the heavy work begins, speak up and let them know.

  1. Fully Trained

Strong customer service begins with fully trained employees. Workers who don’t know what they are doing or don’t fully understand their responsibilities cannot provide proper assistance to their clients. You want to ensure that all employees — no matter their job position or their role in the company — are fully trained. When the staff knows what they are doing, it not only reflects in their overall product but also with each client’s experience.

Safety Training: What You Should Know

When training employees, it shouldn’t simply be time spent focusing on a new policy or how to complete a certain document. Much attention should be placed on the safety of the workers, the home, and any other individual in proximity. Safety training should be mandatory and ongoing. It should not be a one-time training. While many contractors, such as The Renovators of Canada, make safety training a priority, here are a few things you should know and watch out for.

It Encompasses a Variety of Situations

This safety training should focus on a variety of situations from those that are very small and minor to major incidents. The better trained the employees are for certain situations, the more confident clients can feel trusting these workers in their home and with such major projects in their home.

It Is Ongoing

As mentioned previously, safety training should not be a one-time event. As safety policies and procedures change, new training should be made available to employees. Plus, employees should review the content they learn on a regular basis to help them stay up-to-date and ready for whatever the day may throw at them. Additionally, it is important that all employees receive thorough training when first hired to ensure they are trained and aware of any specific policies and procedures to prevent putting themselves or anyone else in danger.

Why the Renovators of Canada Are Your Best Choice

As you narrow down your options of contractors who can help you complete that bedroom renovation or the bathroom remodel in your Toronto home, The Renovators of Canada should be at the top of your list. Not only do they have all the basic needs such as licensing and insurance to ensure a legal project, but they are willing to listen to your needs and offer many ideas to add a custom look to your home. Plus, their extensive training helps you feel confident in their work and in the safety of your home and the workers in it.

Choosing contractors can feel overwhelming — sometimes just as overwhelming as the project itself — but with the right team to work with, you will have a beautiful home that you love and a hassle-free and incredible renovation process.

Contact The Renovators of Canada today to book a free planning session and experience an incredible home remodel.

Need to Know Before Hiring a Kitchen and Bathroom Renovation Contractor

A major kitchen or bathroom remodeling project in your Toronto home can be a hassle and an inconvenience. Before you hire just anyone to begin the project, you must ask the right questions and learn as much as you can about the company and its workers. Here are 10 questions you should always ask before hiring a renovation contractor in Ontario.

1. Do You Have a License?

One of the most important — and one of the first — questions you should ask a renovation contractor is if the company is licensed and has the required certifications to complete the project in your area. Different regions may have varying licensing requirements so it is critical that the company is licensed and able to work on your home.

2. Are You Insured?

Again, this should be one of the first questions you ask before hiring any company to complete a home renovation. If the answer to this question is no, you will want to quickly walk away. If the company is insured, find out how they are insured. The company should have both workers’ compensation and liability insurance. It is also wise to have the contractor show proof of insurance and not just take their word for it.

3. Can You Provide Me with a Bid?

The price of the project is at the front of every homeowner’s mind. An average kitchen remodel can cost more than $20,000 with a high-end remodel featuring luxury appliances costing more than $50,000. A contractor should provide a bid at the beginning of the renovation process. If possible, ask for an itemized bid. This will give you an idea of how much you are spending on various features and products during the remodel. If you want to save a little money, it also helps you see where these cuts can be made as well.

4. Where Do You Purchase Your Materials?

Many contractors will work with suppliers to purchase their materials. While this is a convenience to them, it can be vital for you. Find out where these materials and supplies are coming from to ensure you are receiving high-quality products. You don’t want to work with contractors who purchase cheap products that lessen the quality of the project.

5. How Long Have You Been in Business?

You want to work with an experienced contractor, particularly on large projects such as bathroom and kitchen renovations. There are many components to these projects and an experienced contractor can help you make the best decision regarding the job and help you create a beautiful living area. In addition, most companies will have photos galleries show-casing past projects. Carefully look through these images to determine the type of quality and creativity the company puts into every project.

Furthermore, when you choose to work with an experienced contractor, you choose a professional who has come across many challenges. You never know what you will find or encounter during a home renovation in Kitchener and these individuals have the training and the experience to handle the situation quickly and without hurting your budget.

6. What is Your Timeline?

The best renovation contractors in Canada will set a timeline and stick to it. A bathroom and kitchen renovation can be major inconveniences in a home and the contractors recognize that. They will do everything they can to complete the project in a fast and efficient manner.

7.  How Do You Protect My Home?

When completing a major bathroom or kitchen renovation, there will be extensive work occurring in the home. Walls may be removed, cupboards torn out, plumbing exposed, etc. There will also be dust and dirt in the home due to the extensive work. You want to know beforehand what the company will do to protect flooring and walls in hallways and nearby rooms. Do they cover these areas? Will you need to remove large furniture items? Additionally, you will have many workers come in and out of your home. If you are away from the house, how will they safeguard your belongings?

8. Will I Need Any Permits and Will You Take Care of that For Me?

Not all home renovation projects require permits, but many do. Talk to the contractor about the need for potential permits and the process to acquire them. Many of the best home renovation contractors in Toronto and area will handle all permits, paperwork, and documentation needed to complete the renovation. This also gives you confidence and assurance that the project is being completed according to the building code and there should be few problems during the final inspection. However, if the contractor says he will handle all the necessary permits, follow up at a later date. You don’t want a missed deadline to cause significant issues.

9. What Are Some Ideas You’d Like to See with My Remodel?

Your contractors are professionals and have likely completed dozens of renovations. Gather ideas from them to create the perfect remodel. These experts may recommend built-in shelves, specific lighting, unique flooring, or other features that you may not have considered. While their style may not fit yours, it can give you some great ideas to create your dream space.

10. Do You Have Any Past Clients I Can Talk to?

If you are going to spend thousands of dollars on a remodel, you want to ensure the quality of the work is exquisite. Speaking with past clients is an excellent way to learn about the contractor, what they do best, where their weaknesses lie, etc. This is also a great way to build confidence in your contractor and know that you made the best decision.

Before you make your final hiring decisions, take the time to talk to the kitchen and bathroom renovation contractors. By asking the above questions and addressing any concerns you may have, you will feel confident in your decision. If you are ready to create a space that you love, contact The Renovators of Canada and schedule your free planning session today!

Getting the Most Out of Your Basement

The Dream is Within Reach

Basement renovations have become incredibly popular for many reasons, but the main reason has been to take advantage of the extra square footage that you have sitting below your main floor. Basements are being renovated with more sophistication. Whether it is a new home office, gym, bedroom, family room, or even sometimes a kitchen!  The basement has given many families the square footage they need to turn their home into a dream home! With more complex basement renovations, means more opportunities for poorly renovated basements. To eliminate the possibilities of a poor renovation, asking a professional to work with you on your renovation plan is significantly important. A professional can help guide you in the right direction. A professional can also take care of all the stress that is attached to performing a renovation. Most likely you have a budget for this basement renovation, and having a professional show you your options in that price range is important as well. Beginning a renovation that is clearly out of your price range can lead to you spending much more dough than you had originally planned to spend. Hiring professional costs money, but this initial investment will allow you to stick to your budget and to renovate your basement perfectly.

Lighting Changes Everything!

I am only going to discuss one significantly important factor to consider when performing a basement renovation. Many people looking to renovate their basements forget to add quality recessed lighting. This means installing lights into the ceiling of your basement. The reason I am emphasizing this aspect of the basement, is due to the fact that most basements have little natural light. Windows tend to be quite small in basements, therefore giving off a dark and sometimes dingy feel. Adding excellent lighting in your basement will give your basement the brightness it needs to be a welcoming space for your family and friends. Recess lighting also saves a lot of space that would otherwise be wasted on lamp space. Saving on space for lamps will give you the ability to truly take advantage of the extra square footage you are accumulating through your basement renovation.

O Canada

Our next blog will include more tips on basement renovations. Living in Canada may give us a tough winter, but having the extra square footage is excellent for us Canadians. We should all use our basements wisely, and this is why we will be creating another blog on basement renovation! We want to help you create your dream home! Remember, if you are going to dream, you might as well dream big!

Written By: Jake Fortinsky

THIS BLOG claims no credit for any images posted on this site unless otherwise noted. Images on this blog are copyright to its respectful owners. If there is an image appearing on this blog that belongs to you and do not wish for it appear on this site, please E-mail (info@trocanada.com) with a link to said image and it will be promptly removed.

Scroll to top
Contact Us
close slider

    Looking to hire a renovator you can trust?

    Take advantage of our 15 year Transferable Warranty!

    What renovation job do you need?*

    What is Refresh icon